Harvey Boulevard| Engineering Projects
This project consists of the construction of the Harvey Boulevard Roadway from Wall Boulevard to Engineers Road (approximately 4,800 feet). Constructed of asphalt, the roadway included four 12-foot-wide traveling lanes separated by a 60-foot-wide median. Additional features included concrete curbs, new traffic signals, subsurface drainage, drainage outfalls and backfilling a major canal. Work on this project also included a 250-foot-long girder bridge to be constructed across Bayou Fatma. Meyer Engineers, Ltd. also conducted an environmental assessment for this project, as well as created and presented exhibits at several public meetings.
Meyer also developed right-of-way map requirements and coordinated right-of-way maps and real estate appraisals. In addition, Meyer Engineers developed cost estimates for the project and coordinated with many agencies including the Jefferson Parish Engineering Department, Louisiana Department of Transportation and Development (LADOTD), USACE and United States Coast Guard. Our firm also developed a joint-use agreement between Plaquemines Parish and Jefferson Parish.
Construction Cost: $14,000,000