Entergy Projects
Entergy Distribution Center Lay Down Yard
Meyer Engineers, Ltd. completed the design for the Entergy Distribution Center Lay Down Yard in Hammond, LA. This project consisted of 3,500 square yards of limestone lot, and also a 24’ x 600’ concrete road connected the existing concrete lot to Pride Drive. The work also included drainage, retention pond, subsurface drainage, and site lighting.
Entergy Zachary Service Center Lay Down Yard
Meyer Engineers, Ltd. completed the Entergy Zachary Service Center Lay Down Yard – Phase I Project. The project consisted of paving portions of the lay down yard and improving the drainage at Entergy’s Facility in Zachary, Louisiana. The work included 1,550 square yards of the existing asphalt lot being replaced with concrete. Also, subsurface drainage was included.
Entergy Virgil Street Pavement Repairs
Meyer Engineers, Ltd. completed the Virgil Street Pavement Repairs Project in Gretna, LA. The project consisted of drainage and pavement at Entergy’s Facility on Virgil Street. Work included a master drainage plan for the site, drainage improvements (sizes 18" to 36"), new driveways, and pavement repairs.
Entergy Hammond Storage Building
Meyer Engineers, Ltd. completed the Entergy Hammond Storage Building Project. The project consisted of the construction of a 40’ x 100’ pre-engineered metal building with associated concrete foundation and lighting. The work included a concrete driveway and a gravel swale to provide drainage for the area.
Entergy Gas Operations
Meyer Engineers, Ltd. completed the Entergy Gas Operations Project in New Orleans. The project consisted of renovating and remodeling the Entergy Gas Operations Services Area located on the second floor of the 505 Magnolia Street Building. The portion of the space that was renovated consisted of approximately 11,400 square feet. The work consisted of painting existing walls and columns, grind and seal concrete floors in work areas, layout new work spaces with full size partition walls, installation of new metal doors, new aluminum windows, installation of acoustical ceiling tiles and tile flooring in office and break room, lighting, electrical and new eye wash sink, and a utility sink.
Entergy Delaronde Campus Interior Renovations
Meyer Engineers, Ltd. completed the Entergy Delaronde Campus Interior Renovations Project in Algiers. The project consisted of renovations to restroom facilities in the Delaronde Street Complex. The work consisted of installation of new light fixtures, vanities, sinks, stall partitions and painting.
Substantial Completion Date: 2014
Construction Costs: $71,000 - $1,200,000